EDGE DATA CENTRE OPPORTUNITY
Papworth /
Cambridge West

A 12.5-acre freehold brownfield site west of Cambridge, with existing buildings ready for reuse and a route to 70 MVA.

Ermine Street South, Papworth Everard, Cambridge CB23 3RD · Subject to contract

DOWNLOAD THE PDF
THE OPPORTUNITY
A brownfield site built for the edge

Freehold, previously developed land with vacant possession, an established access and a substantial building footprint, close to Cambridge and the A14.

12.5 ac

5.05 HA FREEHOLD SITE

282,382

SQ FT EXISTING FLOOR AREA

26

EXISTING BUILDINGS

70 MVA

UKPN BUDGET ESTIMATE

DEFINITION
What is an edge data centre?

A smaller data centre located close to the people and devices it serves, rather than in a remote hyperscale campus. Typically from under 1 MW to a few MW, and often fitted into existing buildings.

HOW IT WORKS
Four mechanisms behind the edge
01
Proximity

Sits near smart devices, mobile towers and local populations, rather than in remote, massive warehouse regions.

02
Latency reduction

Shortens the distance data travels, enabling real-time responses for gaming, streaming and industrial IoT.

03
Caching

Stores frequently requested content locally, so files and video load instantly without buffering.

04
Bandwidth savings

Filters minor data locally and sends only critical updates back to the core cloud.

CORE BENEFITS
Why operators build at the edge
Speed

Ultra-low response times for live, realtime applications.

Efficiency

Less traffic on long-haul backbone networks.

Reliability

Local systems keep running even if the link to the central hub slows.

WHY PAPWORTH
A natural fit for edge
Location

Under a mile from the A14 and around eight miles west of Cambridge.

Buildings

282,382 sq ft across 26 existing buildings, giving scope for phased adaptive reuse.

Power today

Existing 11 kV site supply [c. 4 MVA — to confirm] to support an initial phase.

Power tomorrow

UKPN budget estimate for a 70 MVA firm, dual-circuit 132 kV connection.

STRATEGY
A phased route to scale
PHASE 1
Edge and colocation

Convert selected existing buildings for edge or colocation use, on the existing site supply.

PHASE 2
Data centre campus

Larger new-build data halls once the 70 MVA, 132 kV connection is secured.

Phase 1 brings operators and income to the site while the grid connection progresses.

THE SITE
12.5 acres, ready for reinvention
SITE AREA

5.05 ha (12.5 acres)

FLOOR AREA

26,234 sq m (282,382 sq ft)

TENURE

Freehold, vacant possession

CURRENT USE

Use Class C2

ACCESS

Established, history of HGV use

POWER
A defined route to 70 MVA
PLANNING
A supportive brownfield position
Brownfield

Previously developed land in Use Class C2, outside the Green Belt and within the built-up area of Papworth Everard.

Policy

Adopted Policy E/6 and emerging Policy S/AMC/PH provide for alternative employment uses once healthcare demand has been tested. Marketed since 2019.

Heritage

Within the Papworth Everard Conservation Area, so proposals will be shaped by a heritage-led masterplan.

NEXT STEPS
Proposals invited

Freehold sale, lease, option or joint venture. Viewing strictly by appointment.

INFORMATION AVAILABLE

UKPN budget estimate (May 2026)
Report on title
11 kV supply and water mains drawings
Desktop ground investigation
Site plans

ENQUIRIES

James Edwards

Brightfield Group
james.edwards@brightfieldgroup.co.uk
07881 734 667

Back To Top
Find out more about our Cambridge West Edge Data Centre Opportunity